© WONDERTECH . All rights reserved. WonderTech International Energy Co.Ltd.
Terms of Use Notice | Privacy Policy
INTERNATIONAL ENERGY CO. LTD.
WTE G1000 Integrated Continuous Fast Thermal Decomposition System |
|
Power consumption |
< 15KW, 380V |
Water consumption |
Storage about 3 ton, consumption < 70 L /H |
Reaction space |
About 1.2m3, process rate about 1 ton/h~2.5 ton/h |
Size of waste |
Size of waste: <5cm3, as smaller as fast |
Inlet size |
Diameter about 40cm |
Outlet size |
Diameter about 30 cm |
Fuel consumption for system warming up |
Time of warming up about 1~1.5 hour, oil consumption about 45 L |
Type of fuel for warming up |
Diesel oil or fuel gas |
Max. offgas |
Max. 2000CMH |
Pressure |
Negative ~0.1bar |
Size of system |
L=18m, W=2.35m, H=2.35m |
Distillation capacity |
1500 CMH max |
Including fuel, water, steam separator |
|
Including fuel gas cleaning with activated carbon filter |
|
Including Sulfide , Chlorine removing function |
|
Including waste water treatment |
|
Online fuel gas monitor for H2, CH4, Sulfide, Chlorine |
|
Including Sulfide removing from oil by catalyst |
|
Including oil purification |
G2500X |
G1000 |
M500 |
H300 |
History |
WTE Core Technologies |
Technical Comparision |